2. Projects completed in the first half of 2009
These completed projects represent a total investment value of EUR 23.7 million.
Belgium
-
Aarschot – Nieuwlandlaan: a property of 8,500 m2 for Distrilog on a site of 15,000 m2. The spaces have been let as from 1 January 2009 for nine years on a permanent basis.
-
Courcelles – rue de Liège (phase I): warehouses totalling 30,000 m2 can be built on this site in two phases. Of the first phase of 20,000 m2, 10,000 m2 were completed in April 2009. They have been let to Blount Europe NV, which is part of the US group Blount Inc.
France
-
Lille (Seclin) – rue Marcel Dassault: a new construction project of 12,000 m2 consisting of three cells, of which two have been let. The third cell was completed in the first half of 2009 and is still to be let.
Netherlands
-
Raamsdonksveer – Zalmweg: a sale and rent back transaction in which WDP acquired a site of 7,000 m2 from the Palm group. The site has been let to BSB (Beer and Selected Beverages), the logistics alliance of drinks manufacturers – including Palm – for supplying the Dutch market. BSB has established its distribution centre for the Netherlands on the site and is renting it for ten years on a permanent basis. WDP also acquired the adjoining site of almost 4,200 m2, where it realised an extension of 2,760 m2 for BSB at the end of June 2009.
|
|